saved.works
tag
Tag
Architecture Design
Architecture Design is a browsable saved.works tag spanning 96 works by 36 artists across 1 institution.
Artists under this tag
Hella Jongerius
9 works surfaced for this tag.
Josef Hoffmann
9 works surfaced for this tag.
Barney Bubbles (Colin Fulcher)
7 works surfaced for this tag.
Philippe Starck
7 works surfaced for this tag.
Ettore Sottsass
6 works surfaced for this tag.
Hector Guimard
6 works surfaced for this tag.
Emily Belding
4 works surfaced for this tag.
Koloman Moser
4 works surfaced for this tag.
Museums under this tag
Works under this tag

Yin-Yang/Mao Tapestry
Helena Hernmarck · 1971
Museum of Modern Art · Cotton, wool, nylon, linen, plastic, and sequins

Seibu
Seitaro Kuroda · 1981
Museum of Modern Art · Silkscreen

500f city car
Dante Giacosa · designed 1957 (this example 1968)
Museum of Modern Art · Steel with fabric top

Exposition Albert Guillaume (Poster for the Salon des Cent)
Albert Guillaume · 1896
Museum of Modern Art · Lithograph

Delion
Albert Guillaume · 1895
Museum of Modern Art · Lithograph

Police, Squeeze and Joe Jackson, Propaganda
Brian Davis · 1979
Museum of Modern Art · Lithograph

Poster for the film "Odwiedziny Prezydenta" - Produkcja ZRF Syrena
Hibner · 1960
Museum of Modern Art · Lithograph

Album cover for Annette Peacock, I'm the One
Annette Peacock, Richard Davis · 1972
Museum of Modern Art · Lithograph

Bauhausbücher
László Moholy-Nagy · 1925
Museum of Modern Art · Letterpress

PTT, De Man Achter de Vormgeving van de P.T.T
Pieter Brattinga · 1960
Museum of Modern Art · Offset lithograph

Vorm En Luchtfoto
Pieter Brattinga · 1960
Museum of Modern Art · Lithograph

Architektuur L. Mies van der Rohe (Poster for an exhibition of works by Mies van der Rohe)
Pieter Brattinga · 1959
Museum of Modern Art · Lithograph

Church of Solitude Project, New York, New York, Plan
Gaetano Pesce · 1974-77
Museum of Modern Art · Watercolor, ink and colored ink, gouache and…

Album cover for Elvis Costello and the Attactions, Almost Blue
Barney Bubbles (Colin Fulcher), F-Beat Records · 1981
Museum of Modern Art · Lithograph

Elvis Costello & The Attractions, Almost Blue
Barney Bubbles (Colin Fulcher) · 1981
Museum of Modern Art · Lithograph

Cover for Elvis Costello and the Attractions 12" single "High Fidelity"
Barney Bubbles (Colin Fulcher), F-Beat Records · 1980
Museum of Modern Art · Lithograph

Elvis Costello, Get Happy!
Barney Bubbles (Colin Fulcher) · 1980
Museum of Modern Art · Lithograph

Ian Dury, Do It Yourself (Poster for album distributed by Stiff Records, London)
Barney Bubbles (Colin Fulcher) · 1979
Museum of Modern Art · Silkscreen on wallpaper

Ian Dury, New Boots & Panties
Barney Bubbles (Colin Fulcher) · 1978
Museum of Modern Art · Lithograph

Logo for Ian Dury and the Blockheads 7" single "What a Waste"
Barney Bubbles (Colin Fulcher), Stiff Records, London · 1978
Museum of Modern Art · Lithograph

Album cover for Elvis Costello, My Aim is True
Barney Bubbles (Colin Fulcher), Keith Morris · 1977
Museum of Modern Art · Lithograph

Elvis Costello, Stiff Records
Barney Bubbles (Colin Fulcher), Chris Gabrin · 1977
Museum of Modern Art · Lithograph

Generation X, Marquee Club Residency
Barney Bubbles (Colin Fulcher) · 1977
Museum of Modern Art · Lithograph

The Damned with the Adverts
Barney Bubbles (Colin Fulcher) · 1977
Museum of Modern Art · Lithograph

The Damned, 1st Anniversary Concert
Barney Bubbles (Colin Fulcher) · 1977
Museum of Modern Art · Lithograph

Knit Chair
Emiliano Godoy · 2004
Museum of Modern Art · Birch plywood, veneer and cotton sash cord

Residential Park, No-Stop City project (Plan)
Andrea Branzi · 1969
Museum of Modern Art · Ink, cut-and-pasted self-adhesive polymer sheet, and pressure-transferred…

Upholstery fabric
Astrid Sampe · 1951-1954
Museum of Modern Art · Cotton, fiberglass, and wool

Peninsula Chair
Philippe Starck · 1995
Museum of Modern Art · Mahogany-stained beechwood, cotton upholstery, and aluminum

Liqueur glasses
Josef Hoffmann · c. 1908
Museum of Modern Art · Blown glass

Brooch
Hector Guimard · c. 1909
Museum of Modern Art · Gold, agate, pearls, and moonstones

Settee
Hector Guimard · 1897
Museum of Modern Art · Carved mahogany and tooled leather

Poster for a Religious Calendar (Fromme Kalender)
Koloman Moser · 1903
Museum of Modern Art · Lithograph

Handwoven Scarf Material
Emily Belding · c. 1955
Museum of Modern Art · Cotton

Belding Blocks (Casement cloth)
Emily Belding · c. 1954
Museum of Modern Art · Ramie

Cassius (Casement cloth)
Emily Belding · c. 1954
Museum of Modern Art · Ramie

Shades and Tints (Drapery fabric)
Emily Belding · c. 1954
Museum of Modern Art · Ramie

"A Yankee in Petrograd" Vol. 1 Revenge's Mask by Jim Dollar (Marietta Saginyan)
Aleksandr Rodchenko · 1924
Museum of Modern Art · Gravure

Letter Seal
Hector Guimard · c. 1908
Museum of Modern Art · Gilded bronze

Letter Opener
Hector Guimard · c. 1907
Museum of Modern Art · Rosewood

Honeysuckle Pattern (no. 23596)
William Morris · 1876
Museum of Modern Art · Printed cotton

"A Yankee in Petrograd" Vol. 10 Soviet Explosion by Jim Dollar (Marietta Saginyan)
Aleksandr Rodchenko · 1924
Museum of Modern Art · Gravure

Wall-mounted Compact Disc Player
Naoto Fukasawa · 1999
Museum of Modern Art · ABS plastic and electronic components

The Planet as Festival: Study for Design of a Stadium to Watch the Stars, project (Aerial perspective)
Ettore Sottsass · 1972-73
Museum of Modern Art · Graphite on paper

Colored Vase (3/15)
Hella Jongerius · 2010
Museum of Modern Art · Porcelain

Desk
Hector Guimard · c. 1899
Museum of Modern Art · Olive wood with ash panels

Purkersdorf Side Chair
Josef Hoffmann · c. 1903-06
Museum of Modern Art · Bent beech wood and upholstery

Royalton Bar Stool
Philippe Starck · 1998
Museum of Modern Art · Cast aluminum and velvet

Goblets
Josef Hoffmann · c. 1915
Museum of Modern Art · Glass

Flower Pattern Printed Fabric (no. 23586)
William Morris · Unknown
Museum of Modern Art · Cotton

Layers upholstery textile
Hella Jongerius · 2005-2006
Museum of Modern Art · 100% wool felt, polyester thread

Tudor Rose Pattern Printed Fabric (no. 23591)
William Morris · c.1883
Museum of Modern Art · Cotton

The Planet as Festival: Study for Temple for Erotic Dances, project (Aerial perspective and plan)
Ettore Sottsass · 1972–1973
Museum of Modern Art · Graphite and cut-and-pasted gelatin silver print on…

Neon Cellular Phone
Naoto Fukasawa · 2005
Museum of Modern Art · Plastic

Infobar Cellular Phone
Naoto Fukasawa · 2003
Museum of Modern Art · Plastic and magnesium alloy

Infobar Cellular Phone
Naoto Fukasawa · 2003
Museum of Modern Art · Plastic and magnesium alloy

Wiener Künstler-Postkarte Serie 2/7
Koloman Moser · c. 1898
Museum of Modern Art · Lithograph

USSR Russische Ausstellung
El Lissitzky · 1929
Museum of Modern Art · Gravure

Colored Vase (6/15)
Hella Jongerius · 2010
Museum of Modern Art · Porcelain

Picture Frame
Hector Guimard · c. 1900-1904
Museum of Modern Art · Gilded bronze

Embroidered Flower Plate
Hella Jongerius · 2000
Museum of Modern Art · Cotton and earthenware

Flatware
Josef Hoffmann · 1905
Museum of Modern Art · Silver-plate on nickel silver

Unfoldable Cubes
Hella Jongerius · 2021
Museum of Modern Art · Yarn, paper, foil, and solar strips

Silver Footed Bowl
Josef Hoffmann · c. 1920
Museum of Modern Art · Silver

The Planet as Festival: Gigantic Work, Panoramic Road with View on the Irrawaddy River and the Jungle, project (Aerial perspective)
Ettore Sottsass · 1972-73
Museum of Modern Art · Graphite on paper

Vase
Josef Hoffmann · c. 1905
Museum of Modern Art · Painted perforated metal

Ray Hollis Ashtray
Philippe Starck · 1986
Museum of Modern Art · Polished aluminum

Paris Review
Helen Frankenthaler · 1967
Museum of Modern Art · Lithograph

Luxmaster F Floorlamp
Jasper Morrison · 2000
Museum of Modern Art · Stainless steel, polycarbonate, aluminum and electrical cord

"Repeat Classic Print" Textile
Hella Jongerius · 2001
Museum of Modern Art · Cotton, polyester and rayon

Side Chair
Josef Hoffmann · c. 1905
Museum of Modern Art · Cherry wood and upholstery

Footed Vase
Josef Hoffmann · c. 1915
Museum of Modern Art · Glass

Asteroid Lamp
Ettore Sottsass · 1968
Museum of Modern Art · Perspex and wood

Study for Tea Pot (by Ocean with Shells), project (Perspective)
Ettore Sottsass · 1973
Museum of Modern Art · Graphite and self-adhesive letters on paper

USSR Russische Ausstellung
El Lissitzky · 1929
Museum of Modern Art · Gravure

Extended Jug
Hella Jongerius · 1997
Museum of Modern Art · Porcelain and polyurethane

Dr. Kiss Toothbrush
Philippe Starck · 1996
Museum of Modern Art · Thermoplastic resin and ABS polymer

Rabbit Pattern Printed Fabric (no. 23583)
William Morris · c. 1938
Museum of Modern Art · Cotton

Vase
Emile Gallé · c. 1900
Museum of Modern Art · Glass

Hudson Chair
Philippe Starck · 2000
Museum of Modern Art · High-polished aluminum

The Planet as Festival: Study for Rafts for Listening to Chamber Music, project (Perspective)
Ettore Sottsass · 1972–1973
Museum of Modern Art · Graphite on paper

Kasese Sheep Chair
Hella Jongerius · 1999
Museum of Modern Art · Carbon fiber, fiberglass, and felt

Ver Sacrum (Sacred Spring) (Poster for the Thirteenth Secession exhibition)
Koloman Moser · 1902
Museum of Modern Art · Lithograph

Soft Vase
Hella Jongerius · 1994
Museum of Modern Art · Polyurethane

Sitzmaschine chair with adjustable back (model 670)
Josef Hoffmann · c. 1905
Museum of Modern Art · Bent beechwood with sycamore panels

Lola Mundo Chair
Philippe Starck · 1988
Museum of Modern Art · Cast aluminum legs, ashwood with ebony finish,…

"A Yankee in Petrograd" Vol. 3 Invitation Given by Jim Dollar (Marietta Saginyan)
Aleksandr Rodchenko · 1924
Museum of Modern Art · Gravure

Tumbler
Harry J. Powell · 1880-1914
Museum of Modern Art · Glass

An Exhibition of Graphic Design by Brownjohn, Chermayeff and Geismar
Ivan Chermayeff, Thomas Geismar, Bruce Blackburn, Robert Brownjohn · 1960
Museum of Modern Art · Lithograph

Teatre du Vieux Colombien, Jean Baptiste, Le Mal Aimé
Jean Cocteau · 1948
Museum of Modern Art · Lithograph

Ville de Nice, Jean Cocteau, Tapisserie-Peintures-Dessins
Jean Cocteau · 1953
Museum of Modern Art · Photolithograph

Spectre de la Rose (Nijinsky)
Jean Cocteau · 1911
Museum of Modern Art · Lithograph

Wiener Künstler-Postkarte Serie 1/4
Koloman Moser · 1898
Museum of Modern Art · Lithograph

"Nénuphar" table lamp
Louis Majorelle, Daum Frères, Nancy, France · c. 1900
Museum of Modern Art · Gilt and patinated bronze and acid-etched glass

Wine Glass
Harry J. Powell · 1880-1914
Museum of Modern Art · Glass

Jim Nature Portable Television
Philippe Starck · 1994
Museum of Modern Art · High-density wood and plastic